As part of a new concept for world recognised leading fashion brand Primark, Bolton Signcustom fabricated the first of it’s kind new design store front. Made entirely from aluminium to achieve the clean and sharp look that was desired.
Bolton Sign initially were required to specify materials and construction method to create this stunning entrance feature, then prototype and provide paint samples with various finishes for final approval. It was a long process but 100% worth it to ensure the entire team at Primark were happy with the finished result.
Bolton Sign worked hand in hand with the shopfitters working on behalf of both the shopping centre and Primark ( Stanza & Audas ) on this project to prevent snags and facilitate a smooth installation of surrounding structures.
Main obstacles we had to overcome included